Everything between a bill of materials and a posted cost.

Multi-level BOMs, routings against real workstation capacity, work orders that move stock, job cards that log time on the floor, and subcontracting that tracks your material at the supplier. Every one of them settles into the same ledger the finance team closes on.

8 feature areas·16 record types·One ledger with finance

Inside the module · 57 features/01

What is inside the Manufacturing module.

Eight areas, listed in the order you meet them. Nothing here is a separate purchase, an add-on, or a module you unlock at the next tier.

01

Bills of materials

The structure every other document in the module is generated from.

  • Multi-level BOMs

    Sub-assemblies explode into a full raw-material tree. You can read the direct components or the exploded list, and choose per sub-assembly whether it explodes at all.

  • Default and alternate BOMs

    Several active BOMs per item — one marked default, picked up automatically on a work order. The others stay available for a different route, plant, or customer spec.

  • Phantom BOMs

    A logical grouping that never produces a stock item, for kits and assemblies you want structured but never want to stock.

  • Alternative items

    Nominate substitutes on a line so a shortage of one grade does not stop a run, with the substitution recorded on the work order.

  • Scrap, by-products, and process loss

    A scrap percentage per raw material, scrap items valued at their own rate, and process-loss items where the loss is the finished item itself.

  • Costing basis

    Value materials at valuation rate, last purchase rate, or a named price list. Sub-assemblies can cost from their own BOM rather than a static rate.

  • Percentage-based quantities

    Set component quantities as percentages totalling 100, for formulations where the recipe is a ratio rather than a count.

  • Cost refresh

    Update a BOM against current rates on demand, or have every BOM follow material cost automatically.

  • Variant templates and projects

    A BOM template drives item variants; a project reference carries engineer-to-order cost through to the job.

02

Routings, operations, and workstations

How the work is done, where, in what order, and at what hourly cost.

  • Operations

    Each step is a record with a workstation, a time in minutes, a batch size, and an hourly rate that produces the operating cost.

  • Routing templates

    A named set of operations reused across every item that runs the same way, pulled into a BOM in one field instead of retyped.

  • Enforced sequence

    A sequence ID per operation. A job card cannot be completed before the operation it depends on, and the system refuses rather than warns.

  • Workstation hours

    Working windows per workstation — 9 to 1, 2 to 5 — with a holiday list, so scheduling never places a job on a day the plant is shut.

  • Production capacity

    The number of jobs a workstation can run at the same time, respected when job cards are scheduled.

  • Operating components

    Electricity, rent, consumables, and wages costed separately per workstation, each with its own expense account, company by company.

  • Time between operations

    A minimum gap between sequential operations, for curing, cooling, or setting time that the schedule has to leave room for.

03

Production planning

Turning demand into work orders and purchase requirements, netted against what you already hold.

  • Demand in

    Pull items from sales orders, from material requests, or from a forecast, filtered down to the ones you intend to plan.

  • Sub-assembly decisions

    Every sub-assembly on the plan is set to make in-house, subcontract, or purchase — line by line, not as a blanket policy.

  • Consolidation

    Items sharing a BOM combine into one planned quantity, so the floor gets one run instead of four.

  • Net against stock

    Skip available raw materials and sub-assemblies, and the plan sizes itself to the shortfall using projected quantity rather than raw demand.

  • Material request plan

    The procurement side of the plan, warehouse by warehouse, with availability shown against each line and an export for the buying team.

  • Non-stock and subcontracted items

    Include items that do not maintain stock, and pull in a subcontracted item's raw materials when the exploded view is off.

  • Work orders in bulk

    Create every work order the plan implies in one action after submission, each linked back to the plan and the order that caused it.

  • Closing a plan

    Mark a plan closed and no further work orders or material requests can be raised against it. Discontinued means discontinued.

04

Work orders

The instruction to the floor, and the document that moves the stock.

  • Four warehouses

    Source, work-in-progress, finished goods, and scrap — defaulted per company and overridable per order.

  • Transfer or skip

    Move material to WIP as an explicit transfer, or skip the transfer entirely for lines where the physical move is not worth recording.

  • Backflush rule

    Consume raw materials against the BOM, or against what was actually transferred. It is a setting, and it is the difference between theoretical and real variance.

  • Required items with tolerance

    The material list with alternatives available, and an excess-transfer percentage for the material that genuinely does go over.

  • Operation tracking

    Status and completed quantity per operation, with planned operating cost set against actual as job cards close.

  • Over-production allowance

    Separate percentages for producing over a sales order and over the work order quantity, so a good run is not blocked by a rounding rule.

  • Stop, reopen, and return

    Stop an order mid-run, reopen it, and return unconsumed material to the source warehouse with the stock movement recorded.

  • Serial and batch from the order

    Generate serial numbers or batch numbers for finished goods at the work order, so traceability starts before the first unit exists.

  • Sales order and project links

    An order can carry its originating sales order and a project, which is how engineer-to-order work keeps its cost together.

05

The shop floor

Job cards, time, quantity, and the reasons a machine stopped.

  • A job card per operation

    Each operation on the work order becomes a card at its workstation, drafted the moment the order is submitted.

  • Time logs

    Start and complete on the card, or enter from and to times by hand. Either way the actual time feeds the actual operating cost.

  • Employee assignment

    Who ran the operation, recorded on the card rather than reconstructed later from a shift roster.

  • Completed, scrap, and rejected quantity

    Three separate numbers, plus a pending quantity so partial production does not distort the process-loss calculation.

  • Material against the card

    Raise a material request and transfer stock against a single job card rather than the whole work order, when that is how the line actually draws material.

  • Corrective job cards

    Rework captured as its own card, with its cost optionally added into finished goods valuation instead of quietly disappearing.

  • Inspection from the card

    Raise a quality inspection for the production item directly from the job card at the point the operator sees the problem.

  • Downtime entry

    Machine downtime in minutes against the workstation, which is what turns 'that machine is always broken' into a report.

06

Subcontracting

Work done outside, with your material still on your books.

  • Subcontracting order

    The order to the supplier, with the supplied-items table built from the BOM so both sides agree on what is going out.

  • Service items

    The processing cost is a non-stock service item, priced and accounted separately from the material it is performed on.

  • Material at the supplier

    A send-to-subcontractor stock entry moves material to a supplier warehouse. It is still your stock, in a place you can report on.

  • Subcontracting receipt

    Finished goods and scrap come back, and raw material is consumed by the backflush rule — BOM or actual transfer, your choice.

  • Subcontracting BOM

    A stored relationship between a service item and the finished good, with conversion factor, so the mapping is not retyped every order.

  • Stock reservation

    Reserve the committed material so it cannot be picked for something else while it is earmarked for the subcontractor.

07

Quality on the line

Checks that can stop a document, not a note that someone should have checked.

  • Inspection required

    Flag it on the BOM and a quality inspection template becomes mandatory. The receipt does not post without it.

  • Three points of inspection

    Inbound on receipt, in-process at the job card, and outbound before delivery, each with its own template and criteria.

  • Reading-level criteria

    Acceptance defined per reading with a value or a range, so 'passed' means a number somebody can go back and check.

  • Cost of poor quality

    Rejected and scrap quantities on job cards roll up, so the cost of rework is a figure rather than an argument.

08

Costing and the ledger

Where the whole module lands, and why it lands only once.

  • Operating cost in valuation

    Workstation rates and actual operation time roll into the value of the finished item, not into a separate overhead bucket.

  • WIP accounting

    Work-in-progress sits in its own warehouse with its own account, so the balance sheet shows what is on the floor.

  • Actual against planned

    Material and operating variance on every order, from the same numbers the floor entered rather than a month-end estimate.

  • Cost from consumption

    Take raw material cost from the actual consumption entry rather than the BOM, when what was used is what should be costed.

  • Scrap credited

    Scrap and by-products carry their own rate and reduce the cost of the run they came from.

  • One posting, one trail

    Manufacturing does not keep a second set of books. The entries the plant creates are the entries finance closes on, with the audit trail attached.

How it runs/02

One pass through manufacturing, end to end.

  1. 01

    Plan

    Demand from sales orders, material requests, or forecast is netted against projected stock. The plan sizes itself to the shortfall.

  2. 02

    Release

    Work orders take the default BOM and its routing, draft a job card per operation, and schedule against real workstation hours and capacity.

  3. 03

    Make

    Material moves to WIP, operators log time and quantity per card, inspections gate the steps that need gating, downtime is recorded as it happens.

  4. 04

    Settle

    Finished goods land in stock with serial or batch, scrap is credited, and actual cost against planned posts into the ledger finance closes on.

The switches that decide how it behaves here

Backflush based on
BOM, or material actually transferred
Capacity planning
On or off, with a planning window in days
Overtime and holidays
Permitted or blocked, per company policy
Over-production
Separate allowance for sales order and work order
Default warehouses
WIP, finished goods, and scrap
Serial and batch
Created from the work order, or on receipt
Corrective operations
Included in finished goods valuation, or not
Excess transfer
Allowed against a job card within a tolerance
The records · 16 types/03
ERPNext · Manufacturing, Subcontracting

Every document this module keeps.

BOM

The item structure, with operations, scrap, exploded materials, and costing.

BOM Update Tool

Swap a sub-assembly BOM across every parent that uses it, or refresh cost in bulk.

Routing

A reusable set of operations applied to a BOM in one field.

Operation

A named step, its default workstation, and its time.

Workstation

A machine or cell with hours, capacity, holiday list, and cost components.

Workstation Type

A class of interchangeable workstations for scheduling.

Production Plan

Demand netted against stock, producing work orders and material requests.

Work Order

The instruction to make a quantity, and the document that moves the stock.

Job Card

One operation at one workstation, with time logs and quantities.

Stock Entry

Material transfer for manufacture, manufacture, consumption, and send to subcontractor.

Downtime Entry

Machine downtime in minutes, with the reason, against a workstation.

Subcontracting Order

Work sent outside, with the material supplied against it.

Subcontracting Receipt

Finished goods and scrap back from the supplier, with consumption.

Subcontracting BOM

The stored service-item to finished-good mapping and conversion factor.

Quality Inspection

Reading-level checks that can block a receipt or a delivery.

Manufacturing Settings

The company-level switches that decide how all of the above behaves.

What you can read back/04

Reports that ship with it, not ones you commission.

Production Analytics
Work order volume and status across a period, charted.
Work Order Summary
Produced quantity against each order, with current status.
Job Card Summary
Operation-level progress by workstation, operation, and status.
Open Work Orders
Released but not yet started — the queue in front of the floor.
Work in Progress
Orders currently being made, and how far through they are.
Completed Work Orders
Orders finished in full, for throughput and cycle time.
Issued Items Against Work Order
What actually went into WIP against a given order.
Work Order Consumed Materials
Consumption against plan, which is where material variance shows up.
BOM Stock Report
Raw material availability for a BOM, coloured by whether it is enough.
BOM Search and BOM Explorer
Find every BOM that uses a given raw material, and walk the tree.
Downtime Analysis
Lost minutes by machine and reason, over a period.
Production Planning Report
Demand, plan, and shortfall side by side before you commit.

Next step

Bring one manufacturing process. We will run it live.